- Home
- The Orbit Method
The Orbit Method
Four phases run by one team. We do not hand off between diagnosis and delivery, because that handoff is where transformation programmes die.
Ground
See the floor as it really is.
We spend time on your floor, across shifts, and inside your systems. We map how work actually happens against how the SOP says it does. Changeovers get timed, handovers get watched, and every point where data stops moving gets recorded.
Much of what matters is not in any system. It is in the workaround a supervisor invented years ago that everyone now depends on, and in the reason the second shift does something differently from the first.
Map
A roadmap with a business case.
What to fix first, what to build, configure or buy, what each phase costs and what it returns, sequenced by impact and dependency rather than by what is easiest to sell.
This phase ends with a document your own engineers could execute. That is deliberate: a roadmap that only works while we hold it is not a roadmap.
Build
Engineered for your floor.
Machine connectivity, a unified data layer and digitised workflows across the functions the roadmap prioritised, integrated with your existing ERP and MES rather than replacing them.
We release in stages so each one earns its keep before the next begins. Adoption is designed here, not afterwards: entry points are chosen for the conditions operators work in, and tested on the line before go-live.
Sustain
Until the floor owns it.
Go-live is the midpoint. We train supervisors and operators on the line, rebuild the daily management routine around what the system shows, tune it against real use and measure against the baselines taken before we started.
We stay through at least one full business cycle, including a month-end, an audit and a shutdown, because those are the moments a system reveals what it cannot do.
Six commitments
They shape what we recommend, and they are worth holding us to.
The same people throughout
Whoever walks your floor in the first week is in the room at go-live. No partner-sells, junior-delivers pyramid, and no re-briefing a team that was not there.
Integrate rather than replace
Your ERP and MES stay. Rip-and-replace carries the highest risk and the longest wait for results, and we will argue against it unless the case is overwhelming.
Adoption is a design constraint
Decided while the system is designed, not addressed after go-live. A system that adds time to an operator’s cycle will be worked around.
Baselines before build
We measure before we change anything, so a claim that something improved can be checked rather than asserted, including when it did not.
You own what we build
Source code, documentation and architecture handed over as we go. Your continuity should never depend on our availability.
We will tell you to stop
When a process fix beats software, when the data will not support a model, or when a programme should be halted rather than finished.
Start with the first phase.
The Connected Floor Audit is the Ground and Map phases as a fixed-scope engagement. The roadmap is yours to keep, whoever builds it.